CyberPower PDU20SW8RNET Manuale Utente

Navigare online o scaricare Manuale Utente per Multiprese CyberPower PDU20SW8RNET. CyberPower PDU20SW8RNET User`s manual Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 133
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti

Sommario

Pagina 1 - User’s Manual

PowerPanel® Business Edition User’s Manual Rev. 18 2015/02/11

Pagina 2

8  Google Chrome  Konqueror Installation Installation on Windows A pop-up window will be displayed automatically whe

Pagina 3

98 A confirmation window of a bulk power cycle operation Note: If a group contains the UPS systems which has connected

Pagina 4 - Table of Contents

99 Example: New generic equipment such as a printer or LCD monitor has been connected to UPS outlet #2, use the followin

Pagina 5

100  Name: The name of the UPS/PDU/ATS.  Status: The operating status of the UPS/PDU/ATS.  Outlet: Indicates the o

Pagina 6

101  Monitor the status of computers and equipment connected to the UPS/PDU/ATS.  Issue orders such as shutdown or r

Pagina 7 - Introduction

102 Indicates severe-level power events such as Runtime is insufficient. Indicates warning-level power events such as

Pagina 8

103 Multiple computers and generic equipment can be managed by grouping them. All computers and generic equipment can be

Pagina 9 - Getting Started

104 Summary tab of Details Each group provides information about the communication state or the computer type from the

Pagina 10 - Installation

105  Power On: Click Power On from Power Control in the context menu and a pop-up window will appear. Click “X” to exc

Pagina 11

106 Add Computer/Equipment window Move IT Equipment Select Move from the context menu. A pop-up window will appear and

Pagina 12

107 Summary tab of Details window of printer IT Equipment  Name: The name of this computer or equipment.  Status: T

Pagina 13 - Installation on Linux

9  Choose the component. If one single computer is connected to the UPS directly via a USB or serial connection, Agen

Pagina 14

108  Power Off: Select Power Off from the context menu. Decide whether to turn off the outlet immediately or in sequen

Pagina 15 - Installation on Text Mode

109 The Statistics page shows the chart how to spend the energy in a specified period and also shows the energy statisti

Pagina 16 - Installation on ESXi

110 Set the thresholds for the Center system.  High Threshold. When the whole power consumption of the system exceeds

Pagina 17 - Installation on ESX

111 The administrator can be notified when an event occurs. See Event Action/Notification Recipient page for more detail

Pagina 18

112  Network communication is untouched Center cannot establish communication with PDU on the network or established n

Pagina 19

113 Logs page Each log has details which can be viewed by clicking the icon next the each log. Using the paging toolbar

Pagina 20

114 Logs/Event Logs page Filter The following filter options can be utilized by expanding Filter panel. Once the config

Pagina 21 - Installation on XenServer

115  Severity & Category: The events can be filtered by category and severity. The events can be further divided b

Pagina 22 - Accessing PowerPanel

116 SNMP Community. The Center uses this community to authenticate communication between the PDU and UPS in order to acc

Pagina 23 - Essential Setup

117 Logout The Logout page allows users to log the user out of the web interface. The user will be asked to assure wheth

Pagina 24 - Summary

10  Choose the start menu directory.  Click the Finish button to complete the installation.

Pagina 25 - Information

118  Verify firewall settings. Port 3052(UDP/TCP), port 53568(TCP), port 162(UDP) and port 53566(UDP) should be unbloc

Pagina 26 - System/Information page

119  The account which is used to send WLM notifications may be not available. Using the Verify button on the Windows

Pagina 27

120  Add the below snippet with the IP address and hostname. 192.168.1.1 hostname Note: IP address and host name can

Pagina 28

121  Lookup the commands similar to below examples. Append single parameter following the command as ‘root=UUIS=67f1e9

Pagina 29 - Battery

122 Before launching the PPBE installer, you must change its access permission on the installer. You must have executabl

Pagina 30

123 5. What is the difference of the NCL (Non-Critical Load) outlet and CL (Critical Load) outlet? Which equipment shou

Pagina 31

124 13. I try to set the Client to establish to communication with one of PDUs. How do I identify the targeted device I

Pagina 32 - Configuration

125  If the model name conforms to the format of “PPxxxxE”, it belongs to Professional Tower series.  If the model n

Pagina 33 - Power Failure Condition

126  Click Add button of the VMware Machine Properties to add a USB controller.  Select USB Controller from the lis

Pagina 34 - Power Restore

127  This will add a USB Controller, click Next to add a USB Device.  Select New USB Controller and click Add to ad

Pagina 35 - Bypass Condition

11 Installation on Linux The installer is used to install the software and requires root permission. The installation w

Pagina 36

128  Select USB Device item and click Next to proceed.  Select the USB Device of the target UPS which is connected

Pagina 37 - Diagnostics

129 Note: In order to make sure that USB device of the target UPS can connect to vMA after a USB controller is added, it

Pagina 38 - Battery Test

130 For Linux, run the commands in order to restart the service: sudo service ppbed stop and sudo service ppbed start. 2

Pagina 39 - Indicator Test

131  VMware ESX/ESXi: An enterprise-level computer virtualization product offered by VMware, Inc. It is a component of

Pagina 40 - Manage Loads

12  Choose the component. If one single computer is connected to the UPS directly via a USB or serial connection, Age

Pagina 41 - Manage PDU and ATS

13  Click the Finish button to complete the installation. Installation on Text Mode When the system does not support

Pagina 42 - EnergyWise

14  Choose the component. If one single computer is connected to the UPS directly via a USB or serial connection, Age

Pagina 43 - Connect with Cisco Switch

15 Before installing Agent with the USB or serial connection, make sure that the platform running the Agent supports USB

Pagina 44

16  Click Browse to import the ppbeXXX_centos.ovf extracted from the downloaded zip file. Click Next to start a deplo

Pagina 45 - Power/Information page

17  Enter the name for the deployed virtual appliance. This name should be unique within the inventory.  Select th

Pagina 46

2 ELECTRONIC END USER LICENSE AGREEMENT FOR CYBERPOWER POWERPANEL BUSINESS EDITION NOTICE TO USER: THIS IS A CONTRACT.

Pagina 47

18  A deployment detail is displayed. Click Finish to start the deployment task.  After the deployment task is com

Pagina 48

19  Click Power on the virtual machine to power on the virtual appliance.  Login the virtual appliance. The defau

Pagina 49

20 procedure (CD_Drive is a CD drive formatted as D: or E:). A popup window will be displayed when the installation is l

Pagina 50

21 Change language Login The default username is admin and the password is admin. For security, it is recommended to ch

Pagina 51 - Command

22 Agent  Make sure a USB or serial cable is connected between the Agent computer and the UPS. If Agent is installed o

Pagina 52

23 System/Summary page in Agent In Agent, the System/Summary page provides an overview of the system operation. This in

Pagina 53 - Shutdown

24 System/Information page The System/Information page shows detailed information about the Client as follows.  Name:

Pagina 54

25 UPS/Status page of a PR1000LCDRTXL2Ua Input  Status: Displays the present status of the utility power supplied to

Pagina 55

26  Current: The current of the utility power supplied to the UPS.  Power Factor: The radio of the real power flowin

Pagina 56

27  ECO Mode: On-line UPS enters Economy mode. The UPS will enter bypass mode according to thresholds for input voltag

Pagina 57

3 4. No Warranty. The Software is being delivered to you AS IS and its supplier makes no warranty as to its use or perfo

Pagina 58

28  Boost Charging: Boost charging involves a high current for a short period of time to charge the battery. Boost cha

Pagina 59 - Action Settings

29  Rectifier Overheat: The internal temperature of module rectifier exceeds the normal rating.  Inverter Overheat:

Pagina 60

30  Voltage Rating: The input voltage range (Volts) of the UPS.  Frequency Rating: The input frequency range (Hz) o

Pagina 61 - Windows Live Messenger

31  Frequency Working Mode: Smart App Online series supports two frequency modes: Follow-up and Fixed. In the Follow-u

Pagina 62 - XMPP Instant Messaging

32  Detected Sensitivity: When the UPS detects that utility voltage is out of range, the UPS will switch to battery mo

Pagina 63 - Short Message Service (SMS)

33 equipment when utility power restores. If the Standby option is selected, the UPS will be off when utility power rest

Pagina 64

34  Energy Saving: When the utility power fails, the batteries will start discharging. If this option is enabled and t

Pagina 65

35  Utility Failure: The utility power fails and the UPS is using the battery power.  Low Battery: The battery capac

Pagina 66

36 UPS/Diagnostics page Battery Test The Battery Test performs a battery test to verify that the batteries are good, an

Pagina 67 - Status Records

37 Runtime Calibration The Runtime Calibration ensures the runtime estimate is accurate with the current load. The resul

Pagina 68

4 Table of Contents Introduction ...

Pagina 69 - Schedule

38 UPS/Load page Manage Loads Users can manage connected loads that include generic equipment and computers from the Lo

Pagina 70 - Schedule page

39 load’s plug from UPS to PDU, from PDU to UPS or between PDUs, assign the target UPS or PDU in the Device option, and

Pagina 71

40 Client computer is printed in gray when the communication is not established The details in list are described as fo

Pagina 72 - Account

41 Connect with Cisco Switch Users can enter all required data and click Apply button to establish connection with the

Pagina 73 - Authentication

42  Endpoint Agent Port: Displays the port between the Agent and EnergyWise service. Agent will interact with Cisco sw

Pagina 74

43 Power/Information page The Power/Information page shows information about the UPS/PDU/ATS which supplies power to th

Pagina 75

44  MAC Address: The MAC address of the UPS RMCARD, PDU or Agent’s network interface.  IP Address: The IP address of

Pagina 76

45  ATS: Indicates the computer is plugged in an ATS.  Network PDU: Indicates the computer is plugged in one single

Pagina 77 - HTTP Secure

46 causes to search the network to update the results. This option appears when power connection is set from computer to

Pagina 78

47  If the ATS is a power extension from the one UPS, enter the IP address of UPS for one power source and another po

Pagina 79

5 Events ...

Pagina 80 - SSL Certificate

48 Troubleshooting the Client’s inability to communicate with the power device:  Verify the network address is correct

Pagina 81 - Preferences

49 Event Action/Events page in the Agent After selecting an event, the event will become configurable. Configure all of

Pagina 82 - Power Equipment

50  Initiated: Determines whether to execute a command and sets the delay for the command execution. If the event is c

Pagina 83 - Profile

51 BATTERY_REVERSED The polarity of battery is reversed. BYPASS_SEQUENCE_ERROR The phase sequence of bypass is wrong.

Pagina 84

52 Initiate a shutdown sequence when an event occurs. A shutdown sequence is only initiated by events which are of sever

Pagina 85

53 The Agent postpones the shutdown until the Clients computers completes the shutdowns; if the remaining runtime is ins

Pagina 86 - Management

54  Module overload - One of UPS module is . If the UPS module overload is sustained, the UPS module will be protected

Pagina 87

55  Input is near overload. A PDU is near an overload condition. The load level is near the maximum safe load for the

Pagina 88

56 Notification Recipient The Agent and Client can send notifications to multiple recipients in various ways, including

Pagina 89

57  XMPP Account: The XMPP Instant Messaging account of the recipient. See Event Action/Settings for more details abou

Pagina 91 - Device Details

58 After configuring all of the action parameters, and applying the settings, the Verify button can be used to verify wh

Pagina 92 - Details of UPS RMCARD

59  Host Address: This is the address of the VMware ESX/ESXi host that will be shut down by the software in the event

Pagina 93

60  Activate: Specify whether the Agent/Client can use the Windows Live Messenger service to send an instant message t

Pagina 94 - Device Operations

61 Messenger service Messenger Service/Terminal Services/Remote Desktop Service only works on Windows platforms. Option

Pagina 95

62 SMS (Short Message Service) service  Service provider accepts HTTP POST to send messages: This specification from

Pagina 96

63 Address: [email protected] Subject: xxxxxx Content: user:xxxxxx password:xxxxxx

Pagina 97

64 Using the Previous and Next at the upper right corner of the event log list helps users to view the other range of fi

Pagina 98

65 out by the specific device type in Client. When any event option is selected from the event list, the logs only relat

Pagina 99

66 Click the Save shortcut at the right upper corner of the status record table and select CSV or PDF file as the export

Pagina 100 - IT Equipment Details

67 Logs/Settings page in the Agent Event Logging  Entry Expiration: This option specifies how long the log files will

Pagina 101

7 Introduction PowerPanel® Business Edition (PPBE) software provides comprehensive advanced power management for UPS/PDU

Pagina 102 - IT Equipment

68 specify the date and the time to turn on output or turn the specific outlets on. The UPS will turn on the specific ou

Pagina 103 - Toolbar

69  Active: Choose Yes to activate this schedule effective. If No is selected, the schedule will be ignored.  Bank:

Pagina 104 - Group Management

70 Login The Security/Login page is used to change the PowerPanel® Business Edition login account information, including

Pagina 105 - Group Details

71 Session Session Timeout is the option which determines the duration of the session after the login. If the page isn’t

Pagina 106 - Group Operations

72 PowerPanel Secret Phrase. The Secret Phrase is used to create secure network communications between PowerPanel® Appli

Pagina 107 - IT Equipment Management

73 community with write permission, and public with read only permission. The community used by the Client to access the

Pagina 108

74 Network/Trap Notification page in the UPS RMCARD201 web Note: SNMP community is limited to 15 characters in the PDU

Pagina 109 - IT Equipment Operations

75 Network page HTTP Secure PowerPanel® Business Edition allows users to change the secure level and port explained bel

Pagina 110 - Energy Consumption

76 If the user would like ignore the warning page, refer to the Ignore Warning Messages section to continue web access;

Pagina 111 - Settings

77 Firefox displays that the security certification is not trusted. Second, select Permanently store this exception opt

Pagina 112 - Event Action

8 be switched off, the Client will perform a shutdown prior to switching off the power. Refer to Configuration C of the

Pagina 113 - Event List

78 Google Chrome displays that the security certification is not trusted. Safari Click the Continue button to continue

Pagina 114 - System Logs

79 Note: Applying for a certificate from the commercial certificate provider will be subject to the provider fee. Add SS

Pagina 115 - Event Logs

80 Preferences/User Experience page Working Day and Time  Working Day: Set the days users normally work.  Duty Tim

Pagina 116 - Logs/Event Logs page

81 In order for Client to operate properly with the power device, device options can be configured in Client:  Auto C

Pagina 117 - Security

82 In order for administrators to do mass deployment, Profile page allows to export all power configuration and system s

Pagina 118 - Content

83 Place the setup.varfile and installer in the same directory and make sure that filename must be the same, e.g. setup.

Pagina 119 - Technical Support

84 Using PowerPanel Business Edition Center Management Power Equipment Power Equipment page has the following capabiliti

Pagina 120

85 Toolbar of Power Equipment page These three buttons will allow users to add groups, add devices or expand all groups.

Pagina 121

86 A context menu appears by accessing a device node. Each node can be one of the following types: A UPS. This UPS may

Pagina 122

87 decreasing the utility voltage. Test. A battery test is processing. Batteries can have the following states when U

Pagina 123

9 Getting Started Prerequisites Hardware Limitation  733 MHz or higher Pentium-compatible CPU.  256 megabytes (MB) o

Pagina 124

88 Overdried. Indicates the current humidity violates the low humidity threshold. A group has the following states acco

Pagina 125

89 Select IP address by clicking Browse button Move Device Highlight the device you wish to move and select Move in th

Pagina 126

90 Details of UPS RMCARD Summary The Summary tab provides an overview of the system information:  Name: The name of t

Pagina 127

91  Environment Sensor: Indicates whether the environment sensor has been installed on the UPS/PDU/ATS. Note: When the

Pagina 128

92  Battery Replacement Date: The date that the batteries were last replaced. This should be set at the time of batter

Pagina 129

93 Computers on Outlets  Shutdown/Restart: A shutdown or restart can be initiated on a computer with either Agent or C

Pagina 130

94 A confirmation window of a PDU power on operation  Power Cycle: Initiates a Power Cycle on the UPS/PDU/ATS. This w

Pagina 131

95 Click Add Group on the toolbar to create a new group. Add Group button on toolbar You can also add sub-groups in th

Pagina 132 - Glossary

96 Summary tab of Details Each group provides the statistics of all UPS/PDU/ATS from the Summary tab of Details and inc

Pagina 133

97 Power Control  Power Off: Click Power Off and a confirmation window will appear. Pick the UPS/PDU/ATS from the list

Commenti su questo manuale

Nessun commento